![]() ![]() ![]() Surface where plastering is to done shall be thoroughly cleaned with wire brush and made free from slurry droppings, dust, grease and loose material and tie holes shall be plugged.Īll RCC members should be hacked using hacking tool 50 to 70 mm C/C.įix in position level pads at spacing of not more than one length of straight edge for entire surface to be plastered and keep 150 mm from corners.Ĭheck level pads for thickness, if thickness is more do carry out make up coat, and scratch surface rough to receive plaster. box, plumb bob, right angle, masons trowel, aluminum straight edge and chicken mesh and nails. per 50 kg cement for 1st coat, wire brush or scouring tool, hacking tool, G.I. PSC Cement, screened river sand, water, 10 mm aggregates, Integral waterproofing compound (IWC) 100 to 150 ml. Use of PPE’s like safety belt, safety goggles, hand gloves, helmet and gumboots.Ħ. The Project Manager shall be responsible for the overall implementation of this procedure.Įnsure scaffolding is adequately braced with the permanent structure after erection.Įnsure that work area is well illuminated during work.Įnsure that material handling shall be done in proper manner. ![]() This procedure is applicable to the External Plaster work in areas as shown on drawing. This work procedure narrates the guidelines to be adopted for External Plaster works 20mm thick in 2 coats under Civil4M Office Project ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |